Loading…
Loading…
One integrated ERP across scaffolding, MEP, HVAC and valve servicing — so every pipe, panel and props set is accounted for, and every service visit lands on time.
Free, no-obligation consult — just a real person.

Official ERPNext Partner
In business since 2011 · 200+ clients
A scaffolding crew demobilises from a site. Some of the props go back to the yard, some stay for the next contractor, and a few quietly disappear into a corner of a job that finished last month. Meanwhile a valve is due for inspection, an HVAC service ticket is sitting in someone's inbox, and the procurement team is raising an order for material that already exists in another store. Nobody is being careless — the information simply lives in different tools that never speak to each other.
That was the operating reality at VMG — Valmech International Engineering LLC, a diversified supplier and service provider for industrial infrastructure in the United Arab Emirates, covering scaffolding, MEP, HVAC systems and valve supply and servicing. Procurement, project execution and inventory control each ran on their own disconnected tools. Departments coordinated manually, there was no central record, and materials and servicing schedules were tracked only loosely — which meant delays, avoidable overhead, and very little visibility into whether a project had actually made money.
Acube Innovations, an Official ERPNext Partner, implemented a tailored ERPNext solution that pulled supply chain, project management, inventory and service workflows into one centralised, cloud-based system — configured around the way each of VMG's verticals actually operates, not around a generic ERP template.
The headline result: material loss down 43% and processing 79% faster.
In business since
Clients served
ERP projects
Work by referral
| Client | VMG — Valmech International Engineering LLC |
| Location | United Arab Emirates |
| Industry | Construction & industrial services — scaffolding, MEP, HVAC, valve supply & servicing |
| Engagement | ERPNext implementation, customisation and ongoing support |
across procurement, project execution and inventory control — no single system of record.
, so information moved at the speed of phone calls and follow-ups.
the same question got different answers depending on who you asked.
, which pushed jobs out and pushed overhead up.
margin was only clear long after the job closed. > The cost of staying as-is: with rapid expansion and increasingly complex projects, every one of those gaps gets wider, not narrower. Untracked material is bought twice, missed service intervals become emergency callouts, and a project's real margin is a guess until it's too late to act on it.
A tailored ERPNext implementation that unified supply chain, project management, inventory and service workflows on one cloud-based platform — designed to reflect the operational nuances of multiple verticals: scaffolding rental and returns, MEP material handling, HVAC service ticketing and valve inspection cycles.
| Capability | What it gives you |
|---|---|
| Serialised and batch-wise inventory | Every piece of equipment and every spare part is identifiable — you know what you own, where it is, and which batch it came from. |
| Project-based tracking | Scaffolding deployments and MEP installations are costed and monitored against the project they belong to, not a general pool. |
| Service scheduling module | Inspection logs and valve maintenance workflows, so servicing runs on a schedule instead of on memory. |
| Workflow-based approvals & role-based access | Procurement and finance approvals follow a defined path, and people see exactly what their role requires. |
| Custom dashboards | Separate views for operations, site supervisors and management — each audience gets the numbers it actually acts on. |
See it on your data: Call +91 62358 66111 or WhatsApp us.
Two numbers tell the story.
Material loss and wastage fell 43%. Props, panels and fittings stopped disappearing between a demobilised site and the yard, because every movement now has a record against a project rather than living in someone's memory. In a business where the same scaffolding set is issued, returned and reissued dozens of times a year, that is margin recovered directly off the balance sheet.
Processing runs 79% faster. What used to travel between departments as a re-keyed form now moves through one system — so the gap between a job being agreed and material reaching site is a fraction of what it was.
Underneath both sits the same change: real-time visibility of inventory across every location, which is what made the accountability for project timelines and service SLAs possible in the first place.
Most importantly, control moved from individuals to the system. Tighter operational control and cleaner records mean VMG can take on more complex projects without adding proportionate coordination overhead — the groundwork for scalable growth and easier compliance.
We mapped how scaffolding rental and returns, MEP material handling, HVAC ticketing and valve inspection cycles actually run before configuring anything. An ERP that mirrors real operations gets used; one that fights them gets worked around.
Serialised inventory, project-based tracking and service scheduling were built because VMG's work demands them — not bolted on as extras.
Site supervisors, operations and management each got dashboards and permissions matched to their job, so the system reduced work instead of adding a data-entry chore.
The engagement continues as ERPNext support, because a live ERP has to keep evolving with the business.
In business since 2011, 100+ ERP projects, and 70% of our work comes by referral.

Official ERPNext Partner
Yes — that was the core of this build. Scaffolding rental, MEP material handling, HVAC service ticketing and valve inspection all run on the same ERPNext instance at VMG, each with its own workflow, while inventory, procurement and finance stay unified underneath.
Through serialised and batch-wise inventory tied to project-based tracking. Equipment is identifiable at the item level and costed against the project it was deployed to, so returns, balances and losses are visible instead of being reconciled from memory at the end of a job.
It can. VMG's implementation includes a service scheduling module with inspection logs and valve maintenance workflows, so recurring servicing is triggered by the system and logged against the asset rather than depending on someone remembering the interval.
Yes. We configured workflow-based approvals and role-based access control specifically for procurement and finance, so spend follows a defined approval path and each role sees only what it needs.
Absolutely. ERPNext is modular — start where the pain is sharpest, usually inventory and project tracking, prove the value, then extend into service, finance, HR or CRM at your own pace.
We do — Acube serves clients across India and overseas, and VMG is based in the United Arab Emirates. Delivery, training and support are handled remotely with the same process-first approach we use for every implementation.
Get a clear plan, an honest timeline, and a fixed scope. Talk to a real expert today — whether or not you work with us.
Kochi (Kadavanthra & Infopark) · Thiruvananthapuram · across India & overseas · In business since 2011