Loading…
Loading…
Kottayam turns latex into gloves, mats and tread, and paper into books; manufacturing ERP tells each of those units what a batch really cost to make.
Official ERPNext Partner · 100+ ERP projects · Since 2011
Or call +91 62358 66111

Photo: Rison Thumboor · CC BY-SA 4.0, cropped · via Wikimedia Commons
Trusted by 200+ organisations across India & overseas — including






























Natural rubber and latex products
Formulation BOMs, batch-wise mixing, moulding and curing job cards, quality tests recorded per batch, latex and chemical consumption tracked, and yield reports by product and line.
Publishing and printing
Job-based production for presses: estimate, job card, paper and plate issue, machine hours for printing and binding, subcontracted lamination, and actual job cost compared with the quote.
Plantation agriculture (rubber, spices)
Processing of spices and rubber wood with input-to-output yield tracking, grading and packing as operations, batch traceability back to the purchase lot, and by-product stock recorded.
Manufacturing in Kottayam grew out of what the land produces. On the Poovanthuruthu and Nattakom plots, and in smaller sheds around Changanassery and Ettumanoor, units make rubber mats, bands, tread rubber, gloves and moulded goods. Presses turn out books and packaging. Rubber wood and spices are processed for sale. These are mostly small and mid-sized factories where the owner is also the production planner, and costing is done on experience.
ERPNext manufacturing covers bills of materials, including multi-level ones, work orders, job cards by operation and workstation, material requirement planning, subcontracting, batch tracking, quality inspection at receipt and in process, and scrap recording. Material consumed and time booked roll up into an actual cost per batch, which sits beside the standard cost from the BOM. Production is tied to sales orders, purchase and stock in the same system.

Case studies

BrahMos Aerospace Thiruvananthapuram Ltd (BATL)
BrahMos (BATL) — Secure, Auditable ERPNext Finance & Procurement

Biotech Research Society, India (BRSI)
BRSI — Association Management Software for a National Scientific Society

Adventure Sports Cover 360 (ASC360)
ASC360 — ERPNext + Mobile App Cut Policy Issuance Time 70%
A rubber product's formulation is the factory's secret and often exists only in the compounder's diary. A BOM with restricted access records it safely, drives material issue, and shows what each change in formulation does to cost.
Moulding and dipping lines produce rejects and trimmings. If scrap is not recorded, yield looks better than it is and costing is wrong. Work orders capture good quantity, rejects and scrap separately, by shift or machine.
A delivery date given over the phone may clash with material on hand or machines already booked. MRP and a production plan show what can be made when, before the date is promised.
An example
At a rubber goods unit near Changanassery the day begins with a work order for a batch of mats. The compound formulation, held in a restricted bill of materials, drives the issue of rubber, carbon black and chemicals from the store. Mixing is booked at the cluster's shared intermix plant as a subcontracted operation, and the compound returns as a tracked batch. On the moulding line the supervisor records good pieces, rejects and trimmings on a tablet at the end of each shift. Quality readings for hardness go against the batch. By evening the actual cost of the batch sits beside the standard from the BOM, and the difference, mostly extra curing time, is visible to the owner before he quotes the next order from a Kochi buyer.
A manufacturing rollout needs time on the shop floor. We visit your unit in Kottayam to follow a batch from store to dispatch, then build BOMs and routings with your production head. Configuration happens in Kochi. Supervisors are trained at their own machines, in Malayalam where that helps, and we stay through the first production cycles.
Discovery. Your products, bills of materials, routings and how production is planned today.
Blueprint and fixed scope. A clear plan, the deliverables and the timeline, agreed in writing before configuration starts.
Configuration. Bills of materials, work orders, job cards, quality checks and costing.
Data migration. Items, bills of materials and opening stock, including work in progress.
Training, go-live and support. Your team tests on real data, we stand beside you at launch, then support continues under a plan.
The scope and timeline are agreed in writing before work starts.
Yes. A work order can use a standard BOM and still allow substitutions or quantity changes at issue, with the actual consumption recorded. Over time this shows how far real batches drift from standard, which is useful for both costing and quality.
Yes. A small factory may use only BOMs, work orders and stock, leaving out detailed job cards at first. The system can start simple and gain depth as supervisors grow comfortable. There is no per-user licence fee to hold you back.
Yes. Inspection templates define the parameters and acceptable ranges for incoming material, in-process checks and finished goods. Results are stored against the batch, so a customer complaint can be traced to the day, the material lot and the test readings.
After a first conversation about your products, plants and how production is planned and costed today, we agree the scope and send you a written quotation. The price, the deliverables and the timeline are fixed against that scope before any work starts, so nothing grows without your sign-off.
You speak to someone who does this work, not a call centre. They ask about what you make, how production is planned and where costing breaks down. If it looks like a fit, we agree the scope and put it in writing, with the timeline, before any work starts. If it does not, we tell you.
Rubber products cluster, Changanasserycluster
About 48 units doing rubber mixing job-work through an intermix plant, supported by the common facility service centre at Changanassery
Dozens of units send compound through one intermix plant; subcontracted mixing, customer-owned material and per-batch costs are exactly what a manufacturing module has to model.
Source: dcmsme.gov.inRubber cluster, Kottayam (MSE-CDP common facility centre)cluster
One of the earliest MSE-CDP clusters in Kerala (2002-03), with a common facility centre for rubber processing units, implemented through MSME-DI Thrissur and the state government
One of Kerala's earliest MSE-CDP clusters gave processing units a shared facility; booking, costing and quality across members need work orders that cross company lines.
Source: dcmsme.gov.inIndustrial Development Plot, Vaikom (Chalapparambu)park
Small DIC plot of about 3.75 acres with 13 plots, fully allotted
A small fully-allotted plot with a handful of units shows the scale of many Kottayam manufacturers: a few machines, one owner-planner, and costing done from experience.
Source: industry.kerala.gov.inIndustrial Development Plot, Athirampuzhapark
One-acre plot next to the MG University campus, 12 plots, fully allotted
A dozen plots beside the university campus hold small units close to graduate engineers; a system with BOMs and quality records suits a unit that expects to grow.
Source: industry.kerala.gov.inPlaces and organisations are named for local context only. Acube Innovations is not affiliated with or endorsed by them.
Get a clear plan, an honest timeline, and a fixed scope. Talk to a real expert today — whether or not you work with us.
or write to info@acube.co
Kochi (Kadavanthra & Infopark) · Thiruvananthapuram · across India & overseas · In business since 2011